T Girder Bridge Formwork Systems used in New Casting Yard for Russia Client
Nov. 23rd, 2019
Russia client consult T girder bridge formwork systems via HY website. According to HY Bridge Formwork rich experience in T girder bridge formwork systems, one mould needs around 3-3.5 days to completed one precast girder. Considering the lower temperature in Russia, it will need around 4-5days for one girder in Russia. For 640 pieces of girders, it is calculated that client should use 13-16 sets T-girder moulds together if all girders shall be finished within 200 days.
HY engineers provide reliable advice and design solution according to project need and actual working condition for client reference. At last, client would like to place trial order of 3 sets T girder Bridge formwork systems.
Besides formwork systems, Russia client also consult Vibrating motor, Vibrating control cabinet, Tensioning equipment (including jack), as well as gantry cranes for casting yard.
In all client inquiry, HY focus on design solution and quality products based on long term cooperation. Client first, quality foremost.